Tarling Road

Tarling Road

Apr 05 2018 | Latest News

Client: London Borough of Barnet

Main Contractor: Graham Construction

Consulting Engineer: JBE / WYG

Location: London

JBE have been awarded the design and build contract for supply, installation, testing and commissioning of the MEP Services associated with the construction of a new Community Centre. The new Hub will replace the Old Barn Community Centre providing a shared space for the local community groups. The project is due for completion in September 2018.

Mechanical Services include LTHW Heating, Gas Fired Hot Water Generation, Mechanical and Heat Recovery Ventilation Systems, Domestic Hot and Cold Water, Foul Drainage, Natural Gas, BMS and Sanitary Ware.

Electrical Services include LV Distribution and Switchgear, Small Power, Internal Lighting, Emergency Lighting, External Lighting, Lighting Controls, Fire Alarm, Intruder Alarm, Disabled Toilet & Refuge Alarms, CCTV, Data, Sound Limiting Equipment, Lightning Protection, Earthing and Bonding.

The project has a BREEAM Target Rating of ‘Very Good’.