JTI Cigar Factory

JBE have successfully completed the supply, installation, testing and commissioning of the Mechanical and Electrical services within the purpose built Cigar Factory for JTI which included its own specialist Conditioning Room for the tobacco.

All M&E services within the Conditioning Room were stainless steel, some of which required specialist offsite prefabrication.

The Mechanical Services included Steam and Condensate, LTHW Heating, Compressed Air, Mechanical Ventilation, Heat Recovery Ventilation, Humidity Control, Domestic Hot and Cold Water, Foul Drainage, Natural Gas, Automatic Controls and Sanitary Ware.

Electrical services included LV Distribution and Switchgear, Small Power, BMS Wiring, Internal Lighting, Emergency Lighting, External Lighting, Lighting Controls, Fire Alarm, Intruder Alarm, Disabled Alarm Systems, Data, Lightning Protection, Earthing and Bonding.

Following on from our success on this project we had completed M&E installations to other projects within the same complex, i.e. Pilot Plant – phases 1 and 2, HV/LV Infrastructure Upgrades, Extension to the OTP Building, Refurbishment of the R&D Facilities and Refurbishment of the South Factory Offices.

We have a dedicated team of Mechanical and Electrical Engineers who are based on site full time and provide JTI with all their Small Works and Maintenance Requirements.