Project Delaware – ACS Cobham

Project Delaware – ACS Cobham

Oct 04 2017 | Latest News

Client: ACS International Schools Cobham

Main Contractor: Caledonian Modular

Consulting Engineer: Delap and Waller / JBE

Location: Cobham

 

JBE have successfully completed the design and build contract for Mechanical and Electrical Services associated with the new student accommodation block for ACS Cobham International School. The new facility provides an additional 113 bed spaces (all in premium single and double rooms). Supervisor accommodation, study areas and common rooms are in addition to the student bedrooms. As part of our contract we completed the full M&E fit-out of the Pods within Caledonian’s factory in Newark. The main M&E infrastructure was completed on site. The project was completed in August 2017.

Mechanical Services included CHP, LTHW Heating, Underfloor Heating, Chilled Water, Air Conditioning, Mechanical and Heat Recovery Ventilation Systems, Domestic Hot & Cold Water, Foul Drainage, Rainwater, Automatic Controls and Wiring, Natural Gas and Sanitary Ware.

Electrical Services included LV Distribution and Switchgear, Small Power, Internal Lighting, Emergency Lighting, External Lighting, Lighting Controls, CCTV, Access Control, Raise/Lower Bollard System, Disabled Alarm Systems, Fire Alarm, Data, Public Address System, TV and Audio Systems, Induction Loops, Lightning Protection, Earthing and Bonding.IMG_1238 IMG_1233 IMG_1229 IMG_1227 IMG_1209 20170927_112707